Guide

Getting a rental ready for its EICR: an eight-point checklist

Clear the consumer unit, sort the keys and warn tenants about short power cuts. Small jobs that make the inspection quicker and the report complete.
On this page

Nothing on this list is compulsory, but each item makes the visit smoother and helps the inspector test everything first time.

Before the day

  • Clear the way to the consumer unit. The inspector needs room to take the cover off.
  • Keys for meter cupboards and communal areas, including fobs and padlock codes in blocks of flats.
  • Tell tenants the power will go off in short spells. Fridges and freezers are fine if they stay shut.
  • Flag anything that must stay on, such as medical equipment.

On the day

  • Access to every room. In HMOs, locked bedrooms mean untested sockets and a limitation written on the report.
  • Loft, garage and outbuildings. Sheds and garden sockets are part of the installation.
  • Previous certificates for rewires or new circuits help the inspector.
  • Mention any problems, like a breaker that trips or a warm socket.
Share
Need an EICR in Coventry?

Fixed price in writing before we book, PDF report within 48 hours.

Previous
Next

Keep reading

Student lets: why the summer gap is the best time for an EICR

Student lets: why the summer gap is the best time for an EICR

Shared houses near both universities turn over in the same few weeks. Testing while the house is empty makes...

Read more
EICR or PAT testing? Fixed wiring versus appliances

EICR or PAT testing? Fixed wiring versus appliances

They test different things. What an EICR covers, what PAT testing covers, and why a Coventry HMO licence application...

Read more
When is your next EICR due? Working out the renewal date

When is your next EICR due? Working out the renewal date

Five years is the maximum, not the rule. How to read the interval on your last report and when...

Read more